NO |
Name |
Specification |
Note |
Ⅰ |
Crewel cycle operation
production line |
1
、Overall length( L )(Base plate Length
× 2 + 150 )×Workstation N+2000=Lm/n |
2
、Overall width: 2 × W+300 |
3
、Working plate m/m(w,x)400 × 500,500 × 600,600 × 700 |
4
、Workstation population N (person)According to customer
production product assembly station number decision work
quantity |
5
、The automatic control uses the impediment—Getting into
the level moves to carry ex- device—Sets up group × 2
|
Ⅱ |
Level UP-DN The motive moves
to carry machine— 180°The level moves to carry device
2 group =90°× 4 |
Ⅲ |
Double thread middle bridging—
BUFFER CONVEYOR2 group |
Ⅳ |
Subsidiary accessories |
|
A. Daylight lamp
|
40W Single-valve high power
220V (Single line whole line) |
B.AIR The tool
uses the rail track |
Single line whole line establish |
C. Work instruction
book electronic monitoring system |
Double thread A3TYPE The entire
line sets up |
D. Air tubing |
Bilinearity 3/4 Main pipeline
pitch Each location sets
up the group |
E. Plug |
Both sides set up each location
to set up the group |
F. The tool hangs
flat |
The double thread entire line
sets up |